ICE Balancer

ICE-Balancers will be installed into 4-leg sling assemblies (2x 2-leg), to achieve an equal load distribution to all 4 legs. The length tolerances of the single legs will be compensated.

You can calculate with 4 load bearing strands if the following criteria are fulfilled (DGUV-rule 109-017):

  • Two 2-leg slings, therof one sling with a balancer.
  • Both 2-leg slings will be attached to one hook (single or double crane hook)
  • Symmetrical load spreading
  • Max. inclination angle ß 45°

Other important RUD specific information and specialities to our ICE-Balancers can be found in the specific user instruction !

Product variants (5)

Further information of the product